12-30-09 New chainsaw
12-19-09 Lights done floor section torn down
12-17-09 Lights
12-10-09 done with one third!
12-08-09 short Ibeam bolted in place and more joists
12-03-09 almost done with one big section of floor
11-14-09 and two more footings instead of doing a short wall
11-09-09 Replacimg rotted sill beam
11-08-09 last footing
11-04-09 posts up
11-01-09 floor footings cont
10-31-09 floor footings - first time mixing concrete
10-30-09 Floor tear down and cleanup
10-25-09 300sqft floor done
10-19-09 new truck
10-17-09 Misc
10-16-09 Welding quarter panel for Troy
10-11-09 more floor done
10-05-09 20ft floor up - avenger out
10-04-09 Floor work- deer damage
09-30-09 Cars and more floor
09-29-09 Floor construction again
09-28-09 Corvair bought as donor
09-28-09 Floor construction - new cam
09-20-09 Beam in place
09-18-09 Crazy demo at the barn
09-07-09 Beam cleaned and painted
09-06-09 1st I beam raised
09-04-09 Floor tear down
08-30-09 Assembly 2
08-27-09 Assembly
08-25-09 Chassis at house
08-23-09 Finished painting
08-22-09 Buggy body finished
08-19-09 Color sanding and polishing - one side finished
08-19-09 The dull of color sanding
08-18-09 More base and clear coat to sides
08-15-09 Some color sanding 3 areas need a little fixing
08-14-09 Clear coat
08-14-09 Sealer and base coat
08-11-09 After more sanding
08-08-09 Almost ready to spray base
08-06-09 Wet sanding primer
08-05-09 Wet sanding primer w 600
08-04-09 More primer
07-30-09 Sealing the soffit vents
07-18-09 Door channel
07-09-09 Primer
07-04-09 4th of July
06-28-09 More sanding almost ready for color
06-22-09 Around the house - dune buggy ready to finish
06-20-09 Cars out of basement
06-03-09 Flower bed
05-15-09 Wiring at the barn
05-03-09 Electical panel mounted
03-31-09 Ground rods, rocks, cleanup
03-15-09 Concrete slab demolition
03-08-09 New rock wall, busting concrete up
02-26-09 Finished door
02-22-09 New Steel Beams and Door Work
02-15-09 Silo entrance door
02-11-09 Silo entrance
02-08-09 Silo entrance
02-01-09 New Door
01-03-09 Entry door finished and window framing